Project Closed Circuit Television Expansion

Technology Implementation, Technology Planning

Salt Lake City, Utah, USA

Project Description

The JW Group (JWG) was part of a team of consultants in a multiyear capital development program to enhance IT systems and to provide increased support for Delta Airlines at the Salt Lake City International Airport. As part of that project, the team was involved with the coordination and design of numerous Information Systems and building programs simultaneously including enhancing the existing CCTV system.

As part of the overall design team, The JWG personnel performed the design of the CCTV system expansion in addition to the local area network, new communications rooms, and a fiber optic backbone system to support the addition of approximately 385 new cameras. The expanded system consists of new IP cameras networked through an expanded local area network that spans the entire airport campus.

Services Rendered

  • Airport Facility Planning
  • Cost Estimating
  • Design & Engineering
  • Implementation Oversight
  • Procurement Support
  • Project Management
  • Technical Analysis and Research
  • Technology Planning

RELATED PROJECTS