Nairobi, Kenya, East Africa
The JW Group (JWG) personnel was contracted to assess the existing terminal facilities and develop architectural concept design alternatives which would allow for the implementation of international arrival processes and allow integration with the Terminal 4 development program. Furthermore, The JWG was responsible for preparing complete conceptual design documents for the modernization of the existing passenger terminal which included a centralized terminal that integrated with the pre-existing units and expected accommodation of approximately 18 million passengers annually.